Pipeline Construction Bores Pellissipi Parkway

Pipeline Construction installs a 12″ steel high pressure gas line under Pellissippi Parkway as part of the TDOT Lovell Road relocation project.  This 12″ steel gas line installed by horizontal directional boring method.  The bore was approximately 400ft long.

Leave a Reply

Your email address will not be published. Required fields are marked *